Client:
provincial capital Hanover
The two-storey building in the southern part of the Fire and Rescue Station 2 in Hannover-Stöcken is the largest construction project of the Hanover Fire Department since more than 30 years. On the ground floor a pioneering institution is located, in order to be even better prepared for major loss events: A disinfection device for emergency service personnel and vehicles, a medical storage and a vehicle depot. The paramedic school upstairs meets the criteria of passive house construction.
provincial capital Hanover
Polyplan GmbH
Mixed usage of office, warehouse, hall space and training rooms
2008 - 2010
ca. 1.600 m2 total space
ca. 890 m2 energy reference area (first floor)
proKlima
24 cm exterior wall made of reinforced concrete with 30 cm insulation, quality of 0,035 W/(mK), HTC = 0,11 W/(m2K)
insulated wooden windows with heat-insulating 3-pane-glazing
HTC = 0,72 W/(m2K) taking account of the installation
flat roof with 35 cm insulation made of polystyrene, quality of 0,035 W/(mK)
HTC = 0,10 W/(m2K)
The upper floor cantilevers about 60 cm above the ground floor. The cantilever plate is insulated with 30 cm from underneath, quality 0,035 W/(mK); The upper floor cantilevers about 60 cm above the ground floor. The cantilever plate is on the underside insulated with 30 cm, quality 0.035 W/(mK), on the upper side, a floating cement screed was laid on 6 cm heat and impact noise insulation
HTC = 0,09 W/(m2K)
comfort ventilation system with heat recovery functions
heat distribution level of 77 %
The remaining heat is provided by a connection to the district heating network of enercity.
The district heating transfer station is located on the mezzanine level within the thermal building envelope.
no active air conditioning installed
For guarantee of summery comfort, the following measures were realized:
not yet measured
56 kWh/(m²a)