Emergency Service Center, Stöcken

Description

The two-storey building in the southern part of the Fire and Rescue Station 2 in Hannover-Stöcken is the largest construction project of the Hanover Fire Department since more than 30 years. On the ground floor a pioneering institution is located, in order to be even better prepared for major loss events: A disinfection device for emergency service personnel and vehicles, a medical storage and a vehicle depot. The paramedic school upstairs meets the criteria of passive house construction.

Involved parties

Client:

provincial capital Hanover

Design:

agsta – Architekten und Ingenieure

Design Building Technology:

Polyplan GmbH

Building data

Building type:

Mixed usage of office, warehouse, hall space and training rooms

Year of construction:

2008 - 2010

Usable space:

ca. 1.600 m2 total space

ca. 890 m2 energy reference area (first floor)

Subsidies:

proKlima

Building shell

EXTERIOR WALLS:

24 cm exterior wall made of reinforced concrete with 30 cm insulation, quality of 0,035 W/(mK), HTC = 0,11 W/(m2K)

WINDOWS:

insulated wooden windows with heat-insulating 3-pane-glazing

HTC = 0,72 W/(m2K) taking account of the installation

ROOF:

flat roof with 35 cm insulation made of polystyrene, quality of 0,035 W/(mK)

HTC = 0,10 W/(m2K)

BASEMENT CEILING:

The upper floor cantilevers about 60 cm above the ground floor. The cantilever plate is insulated with 30 cm from underneath, quality 0,035 W/(mK); The upper floor cantilevers about 60 cm above the ground floor. The cantilever plate is on the underside insulated with 30 cm, quality 0.035 W/(mK), on the upper side, a floating cement screed was laid on 6 cm heat and impact noise insulation

HTC = 0,09 W/(m2K)

Building technology

VENTILATION:

comfort ventilation system with heat recovery functions

heat distribution level of 77 %

HEATING:

The remaining heat is provided by a connection to the district heating network of enercity.

The district heating transfer station is located on the mezzanine level within the thermal building envelope.

AIR CONDITIONING:

no active air conditioning installed

For guarantee of  summery comfort, the following measures were realized:

  • solid construction for temporary storage of summer heat input
  • external sun protection controlled by wind and sun sensor

Measured values

AIRTIGHTNESS:

not yet measured

Calculated values

HEATING ENERGY NEEDS:

15 kWh/(m²a)

PRIMARY ENERGY NEEDS FOR HEATING,AIR CONDITIONING,DHW,ELECTRICITY:

56 kWh/(m²a)