Client:
Ostland Wohnungsgenossenschaft eG
With the construction of the Passivhaus, the Ostland Wohnungsgenossenschaft (Ostland Housing Corporation) completed GILDE-CARRE, their new residential quarters on the former premises of the Gilde brewery. Together with the existing Ostland administrative building, the gatehouse creates a visual "archway" leading into the northwestern part of the GILDE-CARRE. The building's two – in places three – stories were built out into a total of five apartments, which have variable floor plans and are accessible by elevator. A preschool accommodating up to 27 children is located on the ground floor. The outdoor space is designed to create a direct connection to the newly restructured Kuchengarten urban square and traffic hub.
Ostland Wohnungsgenossenschaft eG
lindener baukontor
Polyplan GmbH
Residential and commercial building with preschool
Hannover-Linden
2010
5
1 child care center
846 m²
proKlima
Clinker facade: Cellular concrete masonry with cavity wall insulation and facing bricks; HTC = 0.14 W/(m2K) Copper facade: Cellular concrete masonry with copper- curtain wall and mineral-wool insulation; HTC = 0.12 W/(m2K) Plastered facade and eternit facade: pre-made wooden element with 36 cm total insulation;
HTC = 0,10 W/(m2K)
Plastic windows with heat-insulating triple glazing;
HTC = 0.72 W/(m2K)
flat green roof with 24 – 32 cm sloped insulation;
HTC = 0.12 W/(m2K)
22 cm insulation atop reinforced concrete slab;
UTC = 0.11 W/(m2K)
Two ventilation systems with heat recovery in the preschool; central comfort-ventilation systems with heat recovery in each of the five apartments
Heating and hot water generation via district heating network; heat -distribution over ventilation systems and bathroom heating elements
no active air conditioning
n50 = 0.4 h-1 in the child care center
n50 = 0.6 h-1 in the apartments
Calculated method: Passivhaus planning package
15 kWh/(m²a)
54 kWh/(m2a)
19 kWh/(m2a)
70 kWh/(m2a)
16 kg/(m2a)